Lighting Design
WPF Engineering provided costruction administration for electrical and lighting design. Amy Zeboor provided electrical and lighting design while at Design Plus Architects. This project renovated an existing building in downtown Chicago. Stringent Chicago electrical and energy codes were adherred to while providing an exciting and budget conscious lighting design. this factility had very low ceiling space and large concrete beams which required coordination of lighting and unique layout. The library will be LEED certified upon completion. This neighborhood library will provide services to the local residents. In the facility there is also a community room. WPF Engineering provided electrical engineering services as well as lighting design services. The library has an easy to use lighting control system. Ridge Point Community Church needed to expand into the shell auditorium they had built about four years ago. Project included the finishing out of the auditorium, A/V edit suites, restrooms, green room and other adjoining rooms. The electrical system was expanded to accomodate the buildout. House lighting and lighting for the ajoining spaces was designed by WPF Engineering. The existing lighting control system and fire alarm system was expanded upon. Project includes renovation of existing high school and new additions. New science classrooms and labs, art rooms, kitchen, serving, commons and main concourse. Renovations of the gym, locker rooms, classrooms and auditorium. A new power service was brought into the building undergoing a complete electrical system upgrade. New energy efficient lighting was provided throughout and an economical lighting control system was provided. Provided guidance of technology (communications cabling, clock system, paging system, classroom A/V systems and telephone additons) by wriiting RFPs in which several contractors were selected for the installation. Provided lighting design, communications design and electrical engineering services. Project involved an addition of classroom spaces, kitchen, dining/gathering area, chapel, choir room and edit suite. Project also involved the renovation of the existing classroom spaces and converting the courtyard to preschool classrooms. Lighting systems were updated throughout to decrease maintenance, provide control and reduce energy costs. Data and telephone network were relocated and cabling throughout facility was updated.
Trendway showroom
Grandville Avenue Neighborhood Library
Ridge Point Community Church - Auditorium Build Out
Holland Christian Schools High School Addition and Renovations
Christ Memorial Reformed Church Addition
Kent County Human Services Complex
The Grand Rapids Ballet Company
One Ludington Place
WPF Engineering provided power and lighting engineering design services for club house and excercise facility