THE KING CO., INC. was selected by The Christman Company to provide design-build earth retention services. The Scope of Work involved the retention of the adjacent revenue control builidng during airport expansion construction. Over 200 linear feet of vibration-free soldier pile wood lagging wall was installed to protection the structure and nearby roadway. The depth of excavation exceeded 16-feet and involved the protection of adjacent utility lines.
Summary
- Type:
- Airport
- Date Completed:
- 01/01/2000