This $1.9 million facility was constructed for a consortium of four area hospitals. Satisfying all four entities throughout the eight-month project was a key to its success. Value engineering enabled Muskegon Construction Company to trim over $100,000 from the budget, providing owners with excellent value while maintaining the highest level of quality.
Features:
• A skylight runs the length of the expansive lobby
to provide an abundance of natural light.
• Comforting color schemes and furniture that feel residential in nature
• Single-story, all-brick facility
• Six-foot thick concrete ceilings and 8.5-foot thick concrete walls provide a safe containment for the powerful rays of the accelerator used to treat patients
• Designed to accommodate a second future accelerator
Summary
- Size:
- 10,000 SF
- Type:
- Hospital
- Budget:
- $1,900,000
- Date Completed:
- 05/01/1993