Description

The System Engineering group designed and installed an electrical system and process controls to accommodate new operations at the existing Michigan Turkey Producers facility. The project was fast-tracked with a tight schedule that required continual design modifications during the construction process. Facility engineering of the plant required incorporating and relocating the existing process machinery, while redistributing the associated power systems. The engineering of the process controls included the use of SCADA technology, which allows the client to maximize production and efficiency.

Summary

Size:
92,000 Sq. Ft.
Type:
Food / Pharmaceutical Plant

Companies On This Project

Overview | How We're Different | Focus Industries | Services | Project Profiles

Home | News & Info | Site Map | Contact Us

©Feyen Zylstra, all rights reserved

Grand Rapids, MI
210 Front Ave. SW
Grand Rapids, MI 49504
616.224.7707

Traverse City, MI
2969 Keystone Road
Traverse City, MI 49686
231.486.8800

Nashville, TN
PO Box 128529
Nashville, TN 37212
800.748.0180