Barnes & Thornburg LLP
171 Monroe Ave. NW #1000 Grand Rapids MI 49503 View Map Project Phase: Complete Budget: $20 Million
Descriptions
Pioneer Construction
The existing space was completely demo’d to an empty shell before construction started. This was a complete renovation with high end Bubinga wood, etched glass, tile and granite.
9th floor renovation was 8000 sq ft.
10th floor renovation was 12,000 sq ft
LEED CI Certified
Barnes & Thornburg receives coveted LEED Certification for Interior
WPF Engineering
WPF Engineering provided lighting design and electrical engineering for this high end tenant fit out. 9th and 10th floors of the City Bank building in downtown Grand Rapids were renovated as office, conference space and lobby spaces.
Designed to LEED silver certification for commericial interiors this space achieved a reduction of lighting density by 25% while still achieving a dramatic lighting affect. In addition controllability of lighting systems point was achieved by allowing all employees to control lighting level in their space to further reduce energy and provide comfort to occupants.
Crites, Tidey & Assoc.
This high end tenant fit out was designed to LEED silver certification for commericial interiors.
Lighting Design / EE: www.wpf-engineering.com
Lighting Products: www.energielighting.com, www.atlantic-lighting.com, www.rsalighting.com, www.zumtobel.us, www.cooperlighitng.com

