Description

The sheet metal work on the tower consisted of two distinctive sections. The clock face and surrounding area were covered with aluminum. The roof was covered with copper. These two sections were individually covered while on the ground before being lifted by a crane to sit in place on top of the tower.

Summary

Type:  Education
Date Completed:  10/01/1994

Companies On This Project